Quick answer

Polyjacking lifts a slab with light polyurethane foam, about 2 to 4 pounds per cubic foot, through 5/8-inch holes. Mudjacking pumps a cement slurry that weighs about 100 pounds or more per cubic foot through larger holes. Foam is ready in about 15 minutes. Replacement takes the most time, because new concrete needs about a week before driving.

Last updated October 2026

How do the three methods compare?

Swipe the table sideways to see all columns.

Polyjacking vs mudjacking vs replacement
 Polyjacking (foam)Mudjacking (slurry)Tear-out and replace
Fill weightAbout 2 to 4 lbs per cu ftAbout 100 to 150 lbs per cu ftNew 4-inch concrete slab
Hole size5/8 inchAbout 1 to 2 inchesNo holes. Old slab is removed
Ready to drive onAbout 15 minutesAbout 24 to 72 hoursAbout 7 to 10 days
DurabilityWater resistant. Does not wash outSlurry can erode or wash out with waterNew slab, but the soil below can still settle
MessSmall patched holesLarger patched holes, more cleanupDemolition, haul-off and forms
Relative cost$6 to $12 per sq ft here ($650 minimum)Varies. Often lower than foamUsually costs more, plus days of demo and cure time

Mudjacking prices vary by contractor, so we do not list one. Our foam lifting rate is $6 to $12 per square foot with a $650 minimum.

Why does fill weight matter on East Valley clay?

A slab sinks because the soil under it could not hold it up. Mudjacking adds heavy slurry on top of that same soil. Sources put mudjacking slurry at about 100 to 150 pounds per cubic foot, against about 2 to 4 pounds for foam. The Arizona Geological Survey warns that much of Arizona has expansive or collapsing soils. Adding very little weight is a big advantage there.

Which method lasts longer?

Sources agree that foam usually lasts longer, but they do not agree on exact years. Cured foam is water resistant and does not wash out. Cement slurry can erode when water runs under the slab, which is common with leaks and monsoon storms. In every method, fixing the water problem matters as much as the fill.

Which method makes less mess?

Polyjacking leaves the fewest marks: small 5/8-inch holes that are patched. Mudjacking uses larger holes, often 1 to 2 inches, and more patching. Replacement means breaking up the old slab, hauling it away, and living with forms and fresh concrete for days.

When is replacement the better choice?

Replace the slab if it is broken into many small pieces, if it is crumbling, or if you want a new shape or finish. Lifting works best when the slab is solid and the problem is the empty space under it.

Frequently asked questions

Is polyjacking worth the extra cost over mudjacking?

Foam material costs more than cement slurry, so some mudjacking quotes come in lower. Foam weighs far less, uses smaller holes, and is ready in about 15 minutes. It also resists washing out. On settling clay and backfill, those points often make foam the better value over time.

Is polyjacking the same as foam jacking or slab jacking?

Polyjacking, foam jacking and polyurethane foam lifting all mean the same thing: lifting concrete with expanding foam. Slab jacking is a general term that some people use for both foam and mudjacking. Mudjacking always means a cement or soil slurry. Ask any contractor which material they use.

How long does each method take before I can drive on it?

With foam, you can usually drive on the slab about 15 minutes after the lift. Mudjacking slurry needs about 24 to 72 hours, depending on the source. A new replacement slab needs about 7 to 10 days before you park on it, according to the Concrete Network.